PPL requirements glossary
The concrete meaning of a numerical abstract element is the set of points or valuations it represents in its stated coordinate space and arithmetic interpretation. Internal matrices, lists and generators are representations of that meaning; their equality need not coincide with semantic equality.
An exact result has the mathematical meaning specified for the operation. An over-approximation contains every concrete result admitted by the inputs. An under-approximation is contained in the intended concrete result set. Neither term implies best precision unless the obligation explicitly says so.
A positive sufficient test can establish a property even when a negative answer is inconclusive. An approximation, an inconclusive result and an error are distinct outcomes and must be interpreted according to the operation's contract.
A space dimension is the number of ordered coordinates of a numerical object. Zero-dimensional spaces, empty sets and universe sets have distinct mathematical meanings. A dimension map specifies how existing coordinates correspond to output coordinates; the precise treatment of removed and new coordinates belongs to each operation's obligation.
A supported context combines only the build choices, enabled interfaces, scalar instantiations and operation arguments admitted by the relevant facility, together with relevant lifecycle activities for process obligations. An applicability facet restricts those contexts. A native machine integer type is distinct from a modeled integer width in a wrapping or analysis operation.
The arithmetic used to compute an abstraction is distinct from the arithmetic being modeled by that abstraction. Unchecked fixed-width overflow may not be signalled. Where a guarantee's normative scope requires intermediate calculations to avoid overflow, small inputs or apparent completion do not establish that condition. Such preconditions do not imply a requirement to detect every unchecked overflow.
Normative scope identifies the inputs and contexts in which a required guarantee applies. A computational-arithmetic precondition concerns the arithmetic used to obtain the result, including relevant intermediate values; it is distinct from the mathematical values being represented or modeled.
An LLR can state a conditional guarantee and explicitly delegate the precise operation-specific preconditions to normative software-specification contracts. Those contracts preserve the required capability and guarantee; they cannot introduce an unannounced restriction through informative text. A condition on a computed numerical result does not redefine a descriptor's mathematical meaning or automatically change another clause's scope.
An execution outside its declared preconditions is not evidence of an exact or sound result merely because it completes. Whether the implementation must detect or reject such a call is a separate contract obligation.
Test means executing selected cases and checking their expected outcomes. Analysis means establishing an obligation by mathematical or logical reasoning. Inspection means examining an artifact against explicit criteria. Review means evaluating the content and supporting argument.
A verification criterion describes acceptance evidence. A parent link or an existing test filename does not demonstrate verification. A soundness proof, execution result, source association and editorial approval are different forms of evidence.
A verification allocation identifies how each obligation will be addressed: through software-specification refinement for interface or behavior contracts, through direct process evidence, or through both for distinct parts. Global implementation-conformance checks that introduce no interface contract can use a justified direct source-analysis or inspection allocation.
A process obligation constrains development, verification or maintenance activities and their results. Its evidence may include reviewed applicability decisions, assessments, analysis results, deviation dispositions or change records. The required evidence depends on the actual obligation. An obligation to establish code conformance requires evidence about the code as well as any supporting administrative records.
Decomposition coverage accounts for all applicable obligations through their reviewed allocations. Verification completion additionally requires acceptable evidence for each obligation and context. Requirement approval confirms reviewed wording; it does not by itself establish either form of completion.
A claim-specific reference identifies the passage supplying an adopted definition, theorem or algorithm in its stated publication and edition. A background reference supplies context without identifying that supporting passage. A valid bibliography key or a whole-work citation does not establish the support for a particular mathematical claim.
A normative standards reference identifies the governing document, edition and applicable amendments or corrigenda, together with the provisions relied upon. A research paper discussing a standard does not replace that normative reference. Reference review establishes applicable errata and compatibility against the authoritative texts.
An inline UID cross-reference provides navigation and target checking between nodes. It is distinct from a Refines or Specifies parent edge and does not by itself demonstrate refinement, coverage or satisfaction.