-
3. Failure and resource safety PPL-LLR-000133 When a supported recoverable failure is reported through a documented error channel, the library shall release temporary resources it owns and leave surviving objects and outputs in the states permitted by the operation's documented failure guarantee. Failure during construction shall release resources acquired for the object whose construction failed. These obligations shall apply whether failure is reported by an exception, error status or host-language error mechanism.
-
8. Controlled runtime operation and resource use PPL-HLR-000008 PPL shall define its initialization, cleanup, runtime configuration and failure behavior, and shall provide the supported mechanisms for controlling long-running computations, so that clients can use the library without violating its documented object and resource-lifetime rules.
-
-
Incoming links from: 4. Binding interruption support and state changes 6. Thread entry and shared-facility use2
5. Watchdog scheduling and cancellation scope PPL-LLR-000135 Where watchdog support is available, the runtime shall accept supported positive timer durations, schedule notifications, and allow cancellation of pending notifications under the documented timer, signal, and thread-ownership restrictions. Failed construction shall not leave a pending event or invalidate existing watchdogs. Unsupported watchdog facilities and invalid durations shall be reported through the documented failure mechanism. Watchdog use shall not imply a hard elapsed-time deadline or a guarantee beyond the documented timer-state failure behavior.
-
8. Controlled runtime operation and resource use PPL-HLR-000008 PPL shall define its initialization, cleanup, runtime configuration and failure behavior, and shall provide the supported mechanisms for controlling long-running computations, so that clients can use the library without violating its documented object and resource-lifetime rules.
-
-
Incoming links from: 3. Bounded-difference intersection and upper bounds 5. Lifted operations on finite pointset powersets 6. Compound extrapolation and finite convergence 1. Coordinate removal and existential projection 4. Sound conversion between numerical abstractions 5. Constraint and congruence refinement 6. Sound affine forward and backward transfers 7. Domain-specific time-elapse abstraction 8. Abstract set-difference semantics 11. Preservation of integer points in integer restriction 12. Modeled bounded-integer arithmetic and wrapping 14. Directional bounds, extrema and attainment 1. Dimension-preserving coordinate forgetting 2. Concatenation, coordinate expansion and folding 3. Narrowing and descending precision recovery 2. Sound successful floating-point linearization 3. Explicit failure of unsupported expression approximation 4. Conservative arithmetic on interval linear forms 2. Affine meaning of linear expressions 3. Sound interval arithmetic 4. Explicit numerical operation contracts 1. Exact integral coefficient calculations 3. Conservative directed numerical bounds 4. Meaning of numerical conversion outcomes 5. Integer quotient and remainder semantics 6. Exact rational arithmetic 3. Octagonal intersection and upper bounds27
1. Meaning of successful exact and approximate results PPL-LLR-000301 For valid inputs under an operation's stated arithmetic and resource assumptions, a successfully reported exact result shall have the specified mathematical meaning, and a successfully reported conservative over-approximation shall contain every concrete result admitted by those inputs.
-
11. Sound and explicit numerical guarantees PPL-HLR-000011 PPL shall distinguish exact numerical results, conservative approximations and inconclusive outcomes, and shall make the assumptions and precision guarantees of each numerical operation explicit.
-
Time shall represent an exact nonnegative integral number of microseconds, with maximum value 106  LONG_MAX + 999999. A valid completed value shall have whole seconds in [0,  LONG_MAX] and a residual microsecond count in [0, 999999]. This raw value interface shall be available independently of operating-system watchdog-timer support and shall not require PPL initialization or floating-point state.
Constructor inputs shall satisfy their stated nonnegative argument preconditions. Concurrent access shall retain ordinary C++ object synchronization requirements. An interval value shall not itself promise elapsed-time measurement, timer resolution or notification scheduling.
-
3. Failure and resource safety PPL-LLR-000133 When a supported recoverable failure is reported through a documented error channel, the library shall release temporary resources it owns and leave surviving objects and outputs in the states permitted by the operation's documented failure guarantee. Failure during construction shall release resources acquired for the object whose construction failed. These obligations shall apply whether failure is reported by an exception, error status or host-language error mechanism.
-
8. Controlled runtime operation and resource use PPL-HLR-000008 PPL shall define its initialization, cleanup, runtime configuration and failure behavior, and shall provide the supported mechanisms for controlling long-running computations, so that clients can use the library without violating its documented object and resource-lifetime rules.
-
-
Incoming links from: 4. Binding interruption support and state changes 6. Thread entry and shared-facility use2
5. Watchdog scheduling and cancellation scope PPL-LLR-000135 Where watchdog support is available, the runtime shall accept supported positive timer durations, schedule notifications, and allow cancellation of pending notifications under the documented timer, signal, and thread-ownership restrictions. Failed construction shall not leave a pending event or invalidate existing watchdogs. Unsupported watchdog facilities and invalid durations shall be reported through the documented failure mechanism. Watchdog use shall not imply a hard elapsed-time deadline or a guarantee beyond the documented timer-state failure behavior.
-
8. Controlled runtime operation and resource use PPL-HLR-000008 PPL shall define its initialization, cleanup, runtime configuration and failure behavior, and shall provide the supported mechanisms for controlling long-running computations, so that clients can use the library without violating its documented object and resource-lifetime rules.
-
-
Incoming links from: 3. Bounded-difference intersection and upper bounds 5. Lifted operations on finite pointset powersets 6. Compound extrapolation and finite convergence 1. Coordinate removal and existential projection 4. Sound conversion between numerical abstractions 5. Constraint and congruence refinement 6. Sound affine forward and backward transfers 7. Domain-specific time-elapse abstraction 8. Abstract set-difference semantics 11. Preservation of integer points in integer restriction 12. Modeled bounded-integer arithmetic and wrapping 14. Directional bounds, extrema and attainment 1. Dimension-preserving coordinate forgetting 2. Concatenation, coordinate expansion and folding 3. Narrowing and descending precision recovery 2. Sound successful floating-point linearization 3. Explicit failure of unsupported expression approximation 4. Conservative arithmetic on interval linear forms 2. Affine meaning of linear expressions 3. Sound interval arithmetic 4. Explicit numerical operation contracts 1. Exact integral coefficient calculations 3. Conservative directed numerical bounds 4. Meaning of numerical conversion outcomes 5. Integer quotient and remainder semantics 6. Exact rational arithmetic 3. Octagonal intersection and upper bounds27
1. Meaning of successful exact and approximate results PPL-LLR-000301 For valid inputs under an operation's stated arithmetic and resource assumptions, a successfully reported exact result shall have the specified mathematical meaning, and a successfully reported conservative over-approximation shall contain every concrete result admitted by those inputs.
-
11. Sound and explicit numerical guarantees PPL-HLR-000011 PPL shall distinguish exact numerical results, conservative approximations and inconclusive outcomes, and shall make the assumptions and precision guarantees of each numerical operation explicit.
-
Default construction shall produce the zero interval. Construction from a nonnegative long centisecond count c shall produce exactly 10000c microseconds in normalized form. Every nonnegative long centisecond value, including LONG_MAX, shall be representable by this conversion. Construction shall retain the allocation-free value protocol of 🔗 9. Allocation-free value operations and fatal range policy.
-
3. Failure and resource safety PPL-LLR-000133 When a supported recoverable failure is reported through a documented error channel, the library shall release temporary resources it owns and leave surviving objects and outputs in the states permitted by the operation's documented failure guarantee. Failure during construction shall release resources acquired for the object whose construction failed. These obligations shall apply whether failure is reported by an exception, error status or host-language error mechanism.
-
8. Controlled runtime operation and resource use PPL-HLR-000008 PPL shall define its initialization, cleanup, runtime configuration and failure behavior, and shall provide the supported mechanisms for controlling long-running computations, so that clients can use the library without violating its documented object and resource-lifetime rules.
-
-
Incoming links from: 4. Binding interruption support and state changes 6. Thread entry and shared-facility use2
5. Watchdog scheduling and cancellation scope PPL-LLR-000135 Where watchdog support is available, the runtime shall accept supported positive timer durations, schedule notifications, and allow cancellation of pending notifications under the documented timer, signal, and thread-ownership restrictions. Failed construction shall not leave a pending event or invalidate existing watchdogs. Unsupported watchdog facilities and invalid durations shall be reported through the documented failure mechanism. Watchdog use shall not imply a hard elapsed-time deadline or a guarantee beyond the documented timer-state failure behavior.
-
8. Controlled runtime operation and resource use PPL-HLR-000008 PPL shall define its initialization, cleanup, runtime configuration and failure behavior, and shall provide the supported mechanisms for controlling long-running computations, so that clients can use the library without violating its documented object and resource-lifetime rules.
-
-
Incoming links from: 3. Bounded-difference intersection and upper bounds 5. Lifted operations on finite pointset powersets 6. Compound extrapolation and finite convergence 1. Coordinate removal and existential projection 4. Sound conversion between numerical abstractions 5. Constraint and congruence refinement 6. Sound affine forward and backward transfers 7. Domain-specific time-elapse abstraction 8. Abstract set-difference semantics 11. Preservation of integer points in integer restriction 12. Modeled bounded-integer arithmetic and wrapping 14. Directional bounds, extrema and attainment 1. Dimension-preserving coordinate forgetting 2. Concatenation, coordinate expansion and folding 3. Narrowing and descending precision recovery 2. Sound successful floating-point linearization 3. Explicit failure of unsupported expression approximation 4. Conservative arithmetic on interval linear forms 2. Affine meaning of linear expressions 3. Sound interval arithmetic 4. Explicit numerical operation contracts 1. Exact integral coefficient calculations 3. Conservative directed numerical bounds 4. Meaning of numerical conversion outcomes 5. Integer quotient and remainder semantics 6. Exact rational arithmetic 3. Octagonal intersection and upper bounds27
1. Meaning of successful exact and approximate results PPL-LLR-000301 For valid inputs under an operation's stated arithmetic and resource assumptions, a successfully reported exact result shall have the specified mathematical meaning, and a successfully reported conservative over-approximation shall contain every concrete result admitted by those inputs.
-
11. Sound and explicit numerical guarantees PPL-HLR-000011 PPL shall distinguish exact numerical results, conservative approximations and inconclusive outcomes, and shall make the assumptions and precision guarantees of each numerical operation explicit.
-
For nonnegative long arguments s and m, two-argument construction shall represent exactly 106s + m microseconds when that result is within 🔗 1. Normalized nonnegative microsecond interval values. Microseconds at or above one million shall be carried into whole seconds and reduced to a residual less than one million. If this nonnegative mathematical result exceeds the representable maximum, construction shall call std::abort under 🔗 9. Allocation-free value operations and fatal range policy, without signed arithmetic overflow or a constructed C++ exception.
-
3. Failure and resource safety PPL-LLR-000133 When a supported recoverable failure is reported through a documented error channel, the library shall release temporary resources it owns and leave surviving objects and outputs in the states permitted by the operation's documented failure guarantee. Failure during construction shall release resources acquired for the object whose construction failed. These obligations shall apply whether failure is reported by an exception, error status or host-language error mechanism.
-
8. Controlled runtime operation and resource use PPL-HLR-000008 PPL shall define its initialization, cleanup, runtime configuration and failure behavior, and shall provide the supported mechanisms for controlling long-running computations, so that clients can use the library without violating its documented object and resource-lifetime rules.
-
-
Incoming links from: 4. Binding interruption support and state changes 6. Thread entry and shared-facility use2
5. Watchdog scheduling and cancellation scope PPL-LLR-000135 Where watchdog support is available, the runtime shall accept supported positive timer durations, schedule notifications, and allow cancellation of pending notifications under the documented timer, signal, and thread-ownership restrictions. Failed construction shall not leave a pending event or invalidate existing watchdogs. Unsupported watchdog facilities and invalid durations shall be reported through the documented failure mechanism. Watchdog use shall not imply a hard elapsed-time deadline or a guarantee beyond the documented timer-state failure behavior.
-
8. Controlled runtime operation and resource use PPL-HLR-000008 PPL shall define its initialization, cleanup, runtime configuration and failure behavior, and shall provide the supported mechanisms for controlling long-running computations, so that clients can use the library without violating its documented object and resource-lifetime rules.
-
-
Incoming links from: 3. Bounded-difference intersection and upper bounds 5. Lifted operations on finite pointset powersets 6. Compound extrapolation and finite convergence 1. Coordinate removal and existential projection 4. Sound conversion between numerical abstractions 5. Constraint and congruence refinement 6. Sound affine forward and backward transfers 7. Domain-specific time-elapse abstraction 8. Abstract set-difference semantics 11. Preservation of integer points in integer restriction 12. Modeled bounded-integer arithmetic and wrapping 14. Directional bounds, extrema and attainment 1. Dimension-preserving coordinate forgetting 2. Concatenation, coordinate expansion and folding 3. Narrowing and descending precision recovery 2. Sound successful floating-point linearization 3. Explicit failure of unsupported expression approximation 4. Conservative arithmetic on interval linear forms 2. Affine meaning of linear expressions 3. Sound interval arithmetic 4. Explicit numerical operation contracts 1. Exact integral coefficient calculations 3. Conservative directed numerical bounds 4. Meaning of numerical conversion outcomes 5. Integer quotient and remainder semantics 6. Exact rational arithmetic 3. Octagonal intersection and upper bounds27
1. Meaning of successful exact and approximate results PPL-LLR-000301 For valid inputs under an operation's stated arithmetic and resource assumptions, a successfully reported exact result shall have the specified mathematical meaning, and a successfully reported conservative over-approximation shall contain every concrete result admitted by those inputs.
-
11. Sound and explicit numerical guarantees PPL-HLR-000011 PPL shall distinguish exact numerical results, conservative approximations and inconclusive outcomes, and shall make the assumptions and precision guarantees of each numerical operation explicit.
-
Copy construction and assignment shall preserve the exact interval value in independent scalar state. Rvalue construction/assignment shall retain the same value semantics, leaving the source value unchanged. Self-assignment shall preserve the interval. Assignment shall return the target object. No copy shall share owned duration state or require allocation, and ordinary destruction shall require no external resource cleanup.
-
3. Failure and resource safety PPL-LLR-000133 When a supported recoverable failure is reported through a documented error channel, the library shall release temporary resources it owns and leave surviving objects and outputs in the states permitted by the operation's documented failure guarantee. Failure during construction shall release resources acquired for the object whose construction failed. These obligations shall apply whether failure is reported by an exception, error status or host-language error mechanism.
-
8. Controlled runtime operation and resource use PPL-HLR-000008 PPL shall define its initialization, cleanup, runtime configuration and failure behavior, and shall provide the supported mechanisms for controlling long-running computations, so that clients can use the library without violating its documented object and resource-lifetime rules.
-
-
Incoming links from: 4. Binding interruption support and state changes 6. Thread entry and shared-facility use2
5. Watchdog scheduling and cancellation scope PPL-LLR-000135 Where watchdog support is available, the runtime shall accept supported positive timer durations, schedule notifications, and allow cancellation of pending notifications under the documented timer, signal, and thread-ownership restrictions. Failed construction shall not leave a pending event or invalidate existing watchdogs. Unsupported watchdog facilities and invalid durations shall be reported through the documented failure mechanism. Watchdog use shall not imply a hard elapsed-time deadline or a guarantee beyond the documented timer-state failure behavior.
-
8. Controlled runtime operation and resource use PPL-HLR-000008 PPL shall define its initialization, cleanup, runtime configuration and failure behavior, and shall provide the supported mechanisms for controlling long-running computations, so that clients can use the library without violating its documented object and resource-lifetime rules.
-
-
Incoming links from: 3. Bounded-difference intersection and upper bounds 5. Lifted operations on finite pointset powersets 6. Compound extrapolation and finite convergence 1. Coordinate removal and existential projection 4. Sound conversion between numerical abstractions 5. Constraint and congruence refinement 6. Sound affine forward and backward transfers 7. Domain-specific time-elapse abstraction 8. Abstract set-difference semantics 11. Preservation of integer points in integer restriction 12. Modeled bounded-integer arithmetic and wrapping 14. Directional bounds, extrema and attainment 1. Dimension-preserving coordinate forgetting 2. Concatenation, coordinate expansion and folding 3. Narrowing and descending precision recovery 2. Sound successful floating-point linearization 3. Explicit failure of unsupported expression approximation 4. Conservative arithmetic on interval linear forms 2. Affine meaning of linear expressions 3. Sound interval arithmetic 4. Explicit numerical operation contracts 1. Exact integral coefficient calculations 3. Conservative directed numerical bounds 4. Meaning of numerical conversion outcomes 5. Integer quotient and remainder semantics 6. Exact rational arithmetic 3. Octagonal intersection and upper bounds27
1. Meaning of successful exact and approximate results PPL-LLR-000301 For valid inputs under an operation's stated arithmetic and resource assumptions, a successfully reported exact result shall have the specified mathematical meaning, and a successfully reported conservative over-approximation shall contain every concrete result admitted by those inputs.
-
11. Sound and explicit numerical guarantees PPL-HLR-000011 PPL shall distinguish exact numerical results, conservative approximations and inconclusive outcomes, and shall make the assumptions and precision guarantees of each numerical operation explicit.
-
For a valid completed interval, seconds() shall return its whole second count and microseconds() its normalized residual, so their mathematical combination equals the exact value. OK() shall test the stored normalization conditions: nonnegative whole seconds and a residual in [0, 999999]. The queries shall preserve the value and require no allocation. They shall not provide a memory-safe validity check for arbitrary corrupted storage or remove constructor preconditions.
-
3. Failure and resource safety PPL-LLR-000133 When a supported recoverable failure is reported through a documented error channel, the library shall release temporary resources it owns and leave surviving objects and outputs in the states permitted by the operation's documented failure guarantee. Failure during construction shall release resources acquired for the object whose construction failed. These obligations shall apply whether failure is reported by an exception, error status or host-language error mechanism.
-
8. Controlled runtime operation and resource use PPL-HLR-000008 PPL shall define its initialization, cleanup, runtime configuration and failure behavior, and shall provide the supported mechanisms for controlling long-running computations, so that clients can use the library without violating its documented object and resource-lifetime rules.
-
-
Incoming links from: 4. Binding interruption support and state changes 6. Thread entry and shared-facility use2
5. Watchdog scheduling and cancellation scope PPL-LLR-000135 Where watchdog support is available, the runtime shall accept supported positive timer durations, schedule notifications, and allow cancellation of pending notifications under the documented timer, signal, and thread-ownership restrictions. Failed construction shall not leave a pending event or invalidate existing watchdogs. Unsupported watchdog facilities and invalid durations shall be reported through the documented failure mechanism. Watchdog use shall not imply a hard elapsed-time deadline or a guarantee beyond the documented timer-state failure behavior.
-
8. Controlled runtime operation and resource use PPL-HLR-000008 PPL shall define its initialization, cleanup, runtime configuration and failure behavior, and shall provide the supported mechanisms for controlling long-running computations, so that clients can use the library without violating its documented object and resource-lifetime rules.
-
-
Incoming links from: 3. Bounded-difference intersection and upper bounds 5. Lifted operations on finite pointset powersets 6. Compound extrapolation and finite convergence 1. Coordinate removal and existential projection 4. Sound conversion between numerical abstractions 5. Constraint and congruence refinement 6. Sound affine forward and backward transfers 7. Domain-specific time-elapse abstraction 8. Abstract set-difference semantics 11. Preservation of integer points in integer restriction 12. Modeled bounded-integer arithmetic and wrapping 14. Directional bounds, extrema and attainment 1. Dimension-preserving coordinate forgetting 2. Concatenation, coordinate expansion and folding 3. Narrowing and descending precision recovery 2. Sound successful floating-point linearization 3. Explicit failure of unsupported expression approximation 4. Conservative arithmetic on interval linear forms 2. Affine meaning of linear expressions 3. Sound interval arithmetic 4. Explicit numerical operation contracts 1. Exact integral coefficient calculations 3. Conservative directed numerical bounds 4. Meaning of numerical conversion outcomes 5. Integer quotient and remainder semantics 6. Exact rational arithmetic 3. Octagonal intersection and upper bounds27
1. Meaning of successful exact and approximate results PPL-LLR-000301 For valid inputs under an operation's stated arithmetic and resource assumptions, a successfully reported exact result shall have the specified mathematical meaning, and a successfully reported conservative over-approximation shall contain every concrete result admitted by those inputs.
-
11. Sound and explicit numerical guarantees PPL-HLR-000011 PPL shall distinguish exact numerical results, conservative approximations and inconclusive outcomes, and shall make the assumptions and precision guarantees of each numerical operation explicit.
-
The six comparison operators shall compare exact total-microsecond values. Equality shall hold exactly for the same duration, regardless of which admitted normalization inputs produced it. Strict and nonstrict order shall have their ordinary mathematical meanings and inequality shall negate equality. Comparing valid values shall not change either operand, allocate or depend on the current clock.
-
3. Failure and resource safety PPL-LLR-000133 When a supported recoverable failure is reported through a documented error channel, the library shall release temporary resources it owns and leave surviving objects and outputs in the states permitted by the operation's documented failure guarantee. Failure during construction shall release resources acquired for the object whose construction failed. These obligations shall apply whether failure is reported by an exception, error status or host-language error mechanism.
-
8. Controlled runtime operation and resource use PPL-HLR-000008 PPL shall define its initialization, cleanup, runtime configuration and failure behavior, and shall provide the supported mechanisms for controlling long-running computations, so that clients can use the library without violating its documented object and resource-lifetime rules.
-
-
Incoming links from: 4. Binding interruption support and state changes 6. Thread entry and shared-facility use2
5. Watchdog scheduling and cancellation scope PPL-LLR-000135 Where watchdog support is available, the runtime shall accept supported positive timer durations, schedule notifications, and allow cancellation of pending notifications under the documented timer, signal, and thread-ownership restrictions. Failed construction shall not leave a pending event or invalidate existing watchdogs. Unsupported watchdog facilities and invalid durations shall be reported through the documented failure mechanism. Watchdog use shall not imply a hard elapsed-time deadline or a guarantee beyond the documented timer-state failure behavior.
-
8. Controlled runtime operation and resource use PPL-HLR-000008 PPL shall define its initialization, cleanup, runtime configuration and failure behavior, and shall provide the supported mechanisms for controlling long-running computations, so that clients can use the library without violating its documented object and resource-lifetime rules.
-
-
Incoming links from: 3. Bounded-difference intersection and upper bounds 5. Lifted operations on finite pointset powersets 6. Compound extrapolation and finite convergence 1. Coordinate removal and existential projection 4. Sound conversion between numerical abstractions 5. Constraint and congruence refinement 6. Sound affine forward and backward transfers 7. Domain-specific time-elapse abstraction 8. Abstract set-difference semantics 11. Preservation of integer points in integer restriction 12. Modeled bounded-integer arithmetic and wrapping 14. Directional bounds, extrema and attainment 1. Dimension-preserving coordinate forgetting 2. Concatenation, coordinate expansion and folding 3. Narrowing and descending precision recovery 2. Sound successful floating-point linearization 3. Explicit failure of unsupported expression approximation 4. Conservative arithmetic on interval linear forms 2. Affine meaning of linear expressions 3. Sound interval arithmetic 4. Explicit numerical operation contracts 1. Exact integral coefficient calculations 3. Conservative directed numerical bounds 4. Meaning of numerical conversion outcomes 5. Integer quotient and remainder semantics 6. Exact rational arithmetic 3. Octagonal intersection and upper bounds27
1. Meaning of successful exact and approximate results PPL-LLR-000301 For valid inputs under an operation's stated arithmetic and resource assumptions, a successfully reported exact result shall have the specified mathematical meaning, and a successfully reported conservative over-approximation shall contain every concrete result admitted by those inputs.
-
11. Sound and explicit numerical guarantees PPL-HLR-000011 PPL shall distinguish exact numerical results, conservative approximations and inconclusive outcomes, and shall make the assumptions and precision guarantees of each numerical operation explicit.
-
For valid operands with a representable sum, compound addition shall replace the target by their exact total-microsecond sum, normalized into seconds and residual microseconds, and return the target object. Adding an object to itself shall use its value on entry. Free addition shall produce the same exact value without changing either input.
If the exact sum exceeds 🔗 1. Normalized nonnegative microsecond interval values, both forms shall call std::abort under 🔗 9. Allocation-free value operations and fatal range policy before signed arithmetic overflow, without constructing a C++ exception. A valid microsecond carry shall be included in that representability decision.
-
3. Failure and resource safety PPL-LLR-000133 When a supported recoverable failure is reported through a documented error channel, the library shall release temporary resources it owns and leave surviving objects and outputs in the states permitted by the operation's documented failure guarantee. Failure during construction shall release resources acquired for the object whose construction failed. These obligations shall apply whether failure is reported by an exception, error status or host-language error mechanism.
-
8. Controlled runtime operation and resource use PPL-HLR-000008 PPL shall define its initialization, cleanup, runtime configuration and failure behavior, and shall provide the supported mechanisms for controlling long-running computations, so that clients can use the library without violating its documented object and resource-lifetime rules.
-
-
Incoming links from: 4. Binding interruption support and state changes 6. Thread entry and shared-facility use2
5. Watchdog scheduling and cancellation scope PPL-LLR-000135 Where watchdog support is available, the runtime shall accept supported positive timer durations, schedule notifications, and allow cancellation of pending notifications under the documented timer, signal, and thread-ownership restrictions. Failed construction shall not leave a pending event or invalidate existing watchdogs. Unsupported watchdog facilities and invalid durations shall be reported through the documented failure mechanism. Watchdog use shall not imply a hard elapsed-time deadline or a guarantee beyond the documented timer-state failure behavior.
-
8. Controlled runtime operation and resource use PPL-HLR-000008 PPL shall define its initialization, cleanup, runtime configuration and failure behavior, and shall provide the supported mechanisms for controlling long-running computations, so that clients can use the library without violating its documented object and resource-lifetime rules.
-
-
Incoming links from: 3. Bounded-difference intersection and upper bounds 5. Lifted operations on finite pointset powersets 6. Compound extrapolation and finite convergence 1. Coordinate removal and existential projection 4. Sound conversion between numerical abstractions 5. Constraint and congruence refinement 6. Sound affine forward and backward transfers 7. Domain-specific time-elapse abstraction 8. Abstract set-difference semantics 11. Preservation of integer points in integer restriction 12. Modeled bounded-integer arithmetic and wrapping 14. Directional bounds, extrema and attainment 1. Dimension-preserving coordinate forgetting 2. Concatenation, coordinate expansion and folding 3. Narrowing and descending precision recovery 2. Sound successful floating-point linearization 3. Explicit failure of unsupported expression approximation 4. Conservative arithmetic on interval linear forms 2. Affine meaning of linear expressions 3. Sound interval arithmetic 4. Explicit numerical operation contracts 1. Exact integral coefficient calculations 3. Conservative directed numerical bounds 4. Meaning of numerical conversion outcomes 5. Integer quotient and remainder semantics 6. Exact rational arithmetic 3. Octagonal intersection and upper bounds27
1. Meaning of successful exact and approximate results PPL-LLR-000301 For valid inputs under an operation's stated arithmetic and resource assumptions, a successfully reported exact result shall have the specified mathematical meaning, and a successfully reported conservative over-approximation shall contain every concrete result admitted by those inputs.
-
11. Sound and explicit numerical guarantees PPL-HLR-000011 PPL shall distinguish exact numerical results, conservative approximations and inconclusive outcomes, and shall make the assumptions and precision guarantees of each numerical operation explicit.
-
For valid operands, compound subtraction shall replace the target by max(0, x − y), using their exact values on entry, and return the target object. A needed microsecond borrow shall preserve that exact nonnegative result. Self-subtraction shall yield zero. Free subtraction shall return the same value without modifying either input. Subtraction shall remain within the normalized value domain and shall not allocate or signal an arithmetic-range failure for valid operands.
-
3. Failure and resource safety PPL-LLR-000133 When a supported recoverable failure is reported through a documented error channel, the library shall release temporary resources it owns and leave surviving objects and outputs in the states permitted by the operation's documented failure guarantee. Failure during construction shall release resources acquired for the object whose construction failed. These obligations shall apply whether failure is reported by an exception, error status or host-language error mechanism.
-
8. Controlled runtime operation and resource use PPL-HLR-000008 PPL shall define its initialization, cleanup, runtime configuration and failure behavior, and shall provide the supported mechanisms for controlling long-running computations, so that clients can use the library without violating its documented object and resource-lifetime rules.
-
-
Incoming links from: 4. Binding interruption support and state changes 6. Thread entry and shared-facility use2
5. Watchdog scheduling and cancellation scope PPL-LLR-000135 Where watchdog support is available, the runtime shall accept supported positive timer durations, schedule notifications, and allow cancellation of pending notifications under the documented timer, signal, and thread-ownership restrictions. Failed construction shall not leave a pending event or invalidate existing watchdogs. Unsupported watchdog facilities and invalid durations shall be reported through the documented failure mechanism. Watchdog use shall not imply a hard elapsed-time deadline or a guarantee beyond the documented timer-state failure behavior.
-
8. Controlled runtime operation and resource use PPL-HLR-000008 PPL shall define its initialization, cleanup, runtime configuration and failure behavior, and shall provide the supported mechanisms for controlling long-running computations, so that clients can use the library without violating its documented object and resource-lifetime rules.
-
-
Incoming links from: 3. Bounded-difference intersection and upper bounds 5. Lifted operations on finite pointset powersets 6. Compound extrapolation and finite convergence 1. Coordinate removal and existential projection 4. Sound conversion between numerical abstractions 5. Constraint and congruence refinement 6. Sound affine forward and backward transfers 7. Domain-specific time-elapse abstraction 8. Abstract set-difference semantics 11. Preservation of integer points in integer restriction 12. Modeled bounded-integer arithmetic and wrapping 14. Directional bounds, extrema and attainment 1. Dimension-preserving coordinate forgetting 2. Concatenation, coordinate expansion and folding 3. Narrowing and descending precision recovery 2. Sound successful floating-point linearization 3. Explicit failure of unsupported expression approximation 4. Conservative arithmetic on interval linear forms 2. Affine meaning of linear expressions 3. Sound interval arithmetic 4. Explicit numerical operation contracts 1. Exact integral coefficient calculations 3. Conservative directed numerical bounds 4. Meaning of numerical conversion outcomes 5. Integer quotient and remainder semantics 6. Exact rational arithmetic 3. Octagonal intersection and upper bounds27
1. Meaning of successful exact and approximate results PPL-LLR-000301 For valid inputs under an operation's stated arithmetic and resource assumptions, a successfully reported exact result shall have the specified mathematical meaning, and a successfully reported conservative over-approximation shall contain every concrete result admitted by those inputs.
-
11. Sound and explicit numerical guarantees PPL-HLR-000011 PPL shall distinguish exact numerical results, conservative approximations and inconclusive outcomes, and shall make the assumptions and precision guarantees of each numerical operation explicit.
-
Admitted Time construction, copying, queries, comparisons, addition and subtraction shall use no heap allocation, floating-point arithmetic, PPL initialization or operating-system timer operation. Unrepresentable normalization/addition shall report its fatal condition by calling std::abort; it shall not allocate or construct a C++ exception in an attempt to report that condition. No recovery or owned- resource cleanup after process termination shall be promised by this value interface. The caller shall retain any surrounding signal/thread context restrictions.